NATIONAL CONSTRUCTION & REMEDIAL

Bringing Buildings Back To Life!

07 5528 4212

ABOUT US

Divider

National Construction & Remedial (NCR) provide over 30 years experience in building repair services, specialising in Waterproofing & Concrete repairs. NCR aim to not only remediate but to rectify the root causes that affect buildings in the harsh Australian environment. NCR work closely with Strata Management Companies, Body Corporate Committees, Building Managers, Project Managers & Structural Engineers to ensure that we exceed our clients expectations.


Servicing Gold Coast, Brisbane and Northern New South Wales.

READ MORE

OUR PROJECTS

Divider
Repair Services
13 Mar, 2024
NCR was recently contracted by a high-rise residential building on the Gold Coast. They were experiencing water ingress through the control joints in the basement parking levels. This issue posed not only safety hazards but also caused damage to the paintwork of vehicles parked underground. If left unaddressed, continual water ingress could compromise the integrity of the concrete and reinforcement, potentially leading to further complications down the line. NCR removed the faulty drip trays, which had been previously installed in a bid to mitigate the excess water issue (not installed by NCR). The NCR team injected the joint with a waterproofing hydrophobic injection grout that fills the voids in the joints, eliminating water ingress and safeguarding the building from future damage.
29 Feb, 2024
NCR was engaged to reinstate the Waterproofing Membrane to approximately 100 square meters of planter boxes at an apartment complex on Kirra Hill. The scope of work consisted of the removal of existing vegetation and soil, the removal of the original waterproofing membrane and surface prep and the reinstatement of the new waterproofing system. Hydro-Excavation was utilised to remove the soil and drainage gravel following the removal of all vegetation. NCR engaged experienced sub-contractors to carry out this portion of the works. Once all vegetation on soil materials were removed the NCR team prepped all surfaces ready to install the Membrane system. All drainage points were cleared of roots, extra scupper holes were drilled into the planters to allow for greater drainage and a floor levelling product was applied to floor to ensure there were no low spots allowing for puddling. Once all the floor wall joints and cracks were routed, sealed and bandaged an Epoxy Primer was applied, followed by 2 Coates of a Class 3 High-Build Polyurethane Waterproofing membrane. Once NCR had complete the Waterproofing of the all the Planter Boxes, handover of the project to a Landscaping firm took place for the reinstatement of new gardens to round out the projects for our clients.
30 Nov, 2023
NCR were engage to remove the existing tiles and membrane from a 100m2 Balcony in Coolangatta. The balcony formed part of the roof structure for the unit below and water ingress had started to cause damage in several areas of the residence. Safety, as always was our major consideration given that the balustrade need to be removed in order to remove the existing tiles and membrane and then reinstall the new waterproofing and tiles. Utilising our trusted sub-contractors, a full scaffolding system was erected to insure the area was safe for work to commence. The system also provided protection from debris falling below toward other residences. Demolition and grinding of the tile and membrane removed all reminisce of the previous membrane and following this all cracks were routed out & sealed and a full 3 coat membrane system was reinstalled. This included detailing of surface defects, bandaging to floor wall joints and the installation of a waterproofing upturn to the columns and floor wall joint to insure a watertight system. There previously had not been a skirting tile nor any upturn waterproofing applied to the floor wall joints and NCR identified this as a potential risk for water ingress. Following the waterproofing system being installed the NCR team then laid 450 x 450 outdoor tiles in a neutral tone were reinstalled to the area and the balustrade was then reinstalled. A beed of uv resistant silicone was then applied to the top perimeter of the skirting tiles, balustrade feet and to the sliding doors where the tiling met the doors ensuring all possible areas for water ingress were addressed.
31 Oct, 2023
National Construction & Remedial (NCR) were contracted to complete concrete spalling repairs to four balcony soffit's and replace metal posts at Golden Sands On The Beach in Main Beach, Gold Coast.
VIEW MORE

FOR ANY ENQUIRES PLEASE CALL OR FILL OUT THE FORM BELOW

07 5528 4212
Repair Services
Share by: