The Oasis Shopping Centre - 1500 m2 Podium Remedial Waterproofing
NCR completed a large-scale remedial waterproofing upgrade across the 1500m2 level 3 podium at The Oasis Shopping Centre in Broadbeach QLD.
Works included full removal and disposal of existing membranes and coatings, mechanical surface preparation back to sound concrete, and repair of cracks and concrete defects. All control and expansion joints were replaced using the ARDEX jointing system with backer rod installation. Waterproofing was completed using the ARDEX WPM system across the podium surface, penetrations, drainage points and planter boxes.






















